Figure 007-13 Mdf Cross Connection For A 4W E&M Trunk Card (Pn-2Odt) (1 Of 2) - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-007
Sheet 17/56
Termination of Cables on the MDF
(2) Tie Line Trunk
(a) 4W E&M (PN-2ODT)
LT00
Note 1:
Both No. 0 and No. 1 circuits must be set to same purpose (2-wire or 4-wire) in one PN-2ODT card.
When connecting the E and M, make the installation cable by using the connector attached with the
Note 2:
PN-2ODT card.
Figure 007-13 MDF Cross Connection for a 4W E&M Trunk Card (PN-2ODT) (1 of 2)
CHAPTER 3
Page 102
Revision 2.0
PIM0
PN-2ODT
CN1
08
07
06
05
04
M1
03
E1
LEN0001
02
M0
LEN0000
01
E0
LEN0000
(No. 0)
LEN0001
(No. 1)
(No. 1)
(No. 0)
LTC0
J
P
TxR0
1
1
TxT0
26
26
RcvR0
2
2
RcvT0
27
27
TxR1
3
3
TxT1
28
28
RcvR1
4
4
RcvT1
29
29
ND-45492 (E)
INSTALLATION CABLE
MDF
(M)
(E)
(Tx Ring)
(Tx Tip)
(Rcv Ring)
(Rcv Tip)
TO TIE LINE

Advertisement

Table of Contents
loading

Table of Contents