Figure 003-25 Connecting The Covers And Ac Cord-A To The Pim - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003
Sheet 30/37
Installation of Main Equipment
3. 19-Inch Rack-Mounting Installation
3.1. Single-PIM Installation
(1) Before mounting the PIM, connect the TOP COVER, BOTTOM COVER and AC CORD-A to the PIM as
shown in
Figure
LOCAL CABLE DUCT

Figure 003-25 Connecting the Covers and AC CORD-A to the PIM

CHAPTER 3
Page 52
Revision 2.0
003-25. The AC CORD-A is pre-installed with the BOTTOM COVER.
PWR CA-A/BUS CABLE DUCT
TOP COVER
BOTTOM COVER
ND-45492 (E)
PIM
TO PZ-PW86
AC CORD-A

Advertisement

Table of Contents
loading

Table of Contents