SL1100
Plywood should first be installed on the wall where the Battery Box will be positioned. This allows secure
anchoring of the screws which support the weight of the Battery Box.
1.
Using four supplied screws, secure the WM Support to the FM/WM Base-F and Base-R.
2.
Refer to Wall-Mount Spacing Guide for required spacing before drilling holes for 10 mm anchor
bolts (locally procured).
Mark and drill the four holes required to install the FM/WM Base.
3.
Using anchor bolts, secure the FM/WM Base to the wall.
2-22
Figure 2-33 Assemble Battery Box Base
ISSUE 1.0
Installation