Chapter 4: Installation

Introduction

Installation
procedure

Prerequisites

This chapter describes how to install the Arc Monitor and set up the system.
Also in this chapter are examples in placing detectors and general informa-
tion concerning the products.
Installation of Arc Monitor is performed in steps. After finishing one step you
proceed to the next one. The sequence is mandatory.
Note!
The Arc Monitor has 10 detector inputs. If your system needs more inputs
then you will need to use additional extension modules.
Installation procedure consists of the following five steps:
1. Getting started
2. Mounting
3. Connecting electrical connections
4. Configuration
5. Controlling
Warning!
The reader should have knowledge and follow the applicable safety laws and
standards as well as local safety instructions.
Installation
21