Grounding Procedure; General; Conductive Pipeline - ABB MINI-MAG 10D1475 Instruction Manual

Magnetic flowmeter
Hide thumbs Also See for MINI-MAG 10D1475:
Table of Contents

Advertisement

10D1475 MINI-MAG MAGNETIC FLOWMETER INSTRUCTION BULLETIN

2.4 Grounding Procedure

2.4.1 General

Satisfactory operation of the Magnetic Flowmeter system requires that careful attention be paid to
proper grounding techniques. Meter grounding requirements are a combination of standard ground-
ing methods and grounding of the meter body to the process liquid. The grounding of the process
liquid places an electrical short circuit through the meter body, thereby routing any stray current
around the process liquid rather than through it.
There are two basic types of piping systems:
• One type is an electrically conducting pipeline in which the process liquid comes in
contact with the conductive pipe. This piping requires only that the grounding wires
be attached to the adjacent pipe flanges.
• In the other case, the pipeline may be lined with a non-conductive material. These
lined pipelines require the use of metal grounding rings to ground the process liquid
and the conductive exterior of the pipe/meter to ground.
A good ground is one that is in contact with the earth over a large conductive area. An excellent
example of this is an iron cold water pipe that is buried in the earth for a considerable distance in its
distribution system. The water pipe laterals form a large conductive area of contact, that in turn
provides a low resistance connection to earth. Plastic pipe does not provide an adequate ground
system.
Select the grounding procedure applicable from Sections 2.4.2 or 2.4.3 that follow. Proper ground-
ing of the Magnetic Flowmeter is required for optimum system performance.

2.4.2 Conductive Pipeline

If the flowmeter is included as part of a conductive pipeline that is not electrically insulated from the
liquid to be metered, the following grounding procedure should be followed. Refer to Figure 2-7 to
supplement the text.
1. Drill and tap a blind hole on the peripheral surface of each of the two adjacent pipeline
flanges (see Figure 2-7 inset). These tapped holes should be placed so that they are within
easy reach of the bonding straps (2 supplied) attached to the ground lug on the meter
housing.
2. Obtain a bright metal surface around the edges of both tapped holes with a file or emery
cloth.
3. Clamp the end of each bonding strap to the adjacent pipe flange, using a pair of hex head
bolts and external tooth lockwashers (supplied by user).
4. The user must supply a sufficient length of grounding wire for connecting the meter
grounding post (ring lug supplied) to a good electrical ground. (Number 12 AWG, or heavier,
copper wire may be used for this grounding wire.)
INSTALLATION
2-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mini-mag 10d1475hMini-mag 10d1475j

Table of Contents