ABB ACSM1 Control Panel User Manual page 39

Hide thumbs Also See for ACSM1 Control Panel:
Table of Contents

Advertisement

Step
Action
3.
• If the downloading is continued, the display shows a message about it.
4.
• Downloading continues, drive is being restarted.
5.
• The display shows the transfer status as a percentage of completion.
6.
• Downloading continues.
7.
• Downloading continues, drive is being restarted.
8.
• Downloading finishes.
9.
Panel shows a text identifying the alarm and returns to the Par Backup.
Display
LOC
PAR BACKUP
Initializing param.
restore operation
00:00
LOC
PAR BACKUP
Restarting drive
00:00
LOC
PAR BACKUP
Restoring/downloading
user set 1
50%
LOC
PAR BACKUP
Initializing param.
restore operation
00:00
LOC
PAR BACKUP
Restarting drive
00:00
LOC
PAR BACKUP
Finishing restore
operation
LOC
ALARM
ALARM 2036
RESTORE
EXIT
Operation
39

Advertisement

Table of Contents
loading

Table of Contents