Installing The Discharge Chute; Installing The Chute Control Gear; Discharge Chute; Chute Retainers - Toro 38066 Operator's Manual

Hide thumbs Also See for 38066:
Table of Contents

Advertisement

Figure 13
1. Handgrip
2. Two inches (five
centimeters)
6. Press the auger/impeller drive control lever slowly
toward the handgrip.
Note: The amount of force needed to compress the
lever increases noticeably when you remove the slack
from the auger/impeller drive belt (approximately
one-half of the lever movement). The adjustment is
correct when the force begins to increase and the
distance between the top of the handgrip and the bottom
of the auger/impeller drive control lever is two inches
(five centimeters) as shown in Figure 13.
Note: If the force does not noticeably increase, remove
the belt cover (refer to steps 1 and 2 of Replacing the
Auger/Impeller Drive Belt on page 25) and measure
two inches (five centimeters) above the handgrip at the
point where you remove the slack from the
auger/impeller drive belt.
7. Adjust the flange nut and the flange locknut (Fig. 12), if
necessary, to obtain the proper dimension between the
top of the handgrip and the bottom of the auger/impeller
drive control lever.
8. Tighten the nuts securely.
m-2628
3. Approximately four inches
(10.2 centimeters)
4. Auger/impeller drive
control lever
12

Installing the Discharge Chute

1. Apply a light coat of low-temperature grease to the
chute ring (Fig. 14).
Figure 14

1. Discharge chute

2. Chute retainer (3)
3. Chute retainer plate (3)
2. Set the discharge chute (open side forward) onto the
discharge opening so that the chute retainers are on the
chute ring (Fig. 14).
Note: Ensure that the chute retainer guide pins are in
the holes in the chute gear.
3. Tighten the screw and the locknut on the left side to
position the chute retainer against the chute retainer
plate and to secure the discharge chute to the chute ring
(Fig. 14).
4. Push the other chute retainers toward the discharge
chute (slotted), and tighten the screws (Fig. 14).
5. Ensure that the chute rotates freely on the chute ring. If
the chute binds, move the right-hand retainer outward
(Fig. 14).
m-168
4. Chute ring
5. Screw (3)
6. Locknut (3)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

824 xl power throw

Table of Contents