4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Network construction
Configure the system and set the parameters which are required for start-up.
• Wiring ( Page 29 WIRING)
• Parameter setting ( MELSEC iQ-R PROFINET IO Device Module User's Manual (Application))
For details on parameters for the IO controller, refer to the following.
Manual of the IO controller or PROFINET configuration tool used
2.
Network diagnostics
Check that communications are performed normally.
For the status of LEDs and input signals of the RJ71PN93 when communications are performed normally, refer to the
following.
Page 36 Checking the network status
3.
Programming
Create a program. For details, refer to the following.
Page 31 COMMUNICATION EXAMPLE
4 PROCEDURES BEFORE OPERATION
22