Huawei FusionModule 1000A20 Maintenance Manual page 39

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule 1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One Data
Center
Maintenance Guide
Impact on the System
Certain services of the FusionModule1000 are interrupted.
Preparations
Tools: Phillips screwdriver, flat-head screwdriver, key to the PDF door, step ladder
Materials: spare ATS controller
Documents: documents delivered with the PDF
Skill requirement: power distribution engineers
Procedure
Step 1 Open the front door of the PDF, turn off the output switches in the PDF, and turn off the
upstream and downstream switches.
Step 2 Remove the protective panel of the PDF.
Step 3 Remove the cables at the ATS controller top and label them.
Step 4 Remove the screws that secure the copper bars above and below the ATS controller, and
remove the copper bars.
Figure 4-3 Removing copper bars
Step 5 Remove the screws from the inner layer of the copper bar below the ATS controller.
Step 6 Remove the four screws that secure the ATS controller to the base and take out the input
switch.
Issue 01 (2019-07-15)
Copyright © Huawei Technologies Co., Ltd.
4 Parts Replacement
32

Advertisement

Table of Contents
loading

Table of Contents