Safety Information
Do not operate devices or handle cables on a stormy day.
To avoid personal injuries, take off your electrostatic discharge (ESD) wrist strap before inserting a power cable.
To avoid personal injuries, arrange enough persons to carry the devices according to the suggestion on the package.
Before handling devices, wear an ESD suite, ESD gloves, or an ESD wrist strap and take off conductive objects such
as ornaments and watches.
To avoid device damage, ensure that the devices are grounded before powering them on.
Do not insert or remove disks or cables during power-on of the CSE. When data is being read or written on hard
disks, do not power off the device by cutting off power or holding down the power button for seconds. Otherwise, the
hard disks may have bad tracks and data may be damaged. To power off the device, stop reading and writing data on
the hard disks first and then send a shutdown command through the operating system (OS).
Installation Process
The power distribution system (DC or AC power distribution box), auxiliary tools (guide rails and floating nuts) are
pre-installed and cables (including power cables and network cables) are laid out in the system cabinet of the CSE
before delivery.
Page 10
Connect the SD-Node.
Connect the C-Node.
Page 10
Page 11
Connect the switch.
Connect the KVM.
Page 11
Page 11
Connect the SMS modem.
Connect the remote modem.
Page 11
Start
Prepare the materials and
Page 2
installation tools.
Page 3
Take antistatic measures.
Install hardware devices of
Page 4 to 7
the CSE.
Page 7 to 11
Connect cables.
Power on the devices and
Page 12 to 13
check indicator status.
Page 14
Install software.
End
Copyright © Huawei Technologies Co., Ltd. 2012. All rights reserved.
1
Determine positions of
Page 4
devices in the cabinet.
Remove filler panels.
Page 5
确定T3200 G3在机柜中的位置
Install back-end storage
Page 5
devices.
Install a KVM.
Page 5
Page 5
Install a switch.
Install a SD-Node.
Page 6
Install a C-Node.
Page 6
Install a SMS modem.
Page 6
Page 7
Install a Remote modem.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei OceanStor CloudStor CSE

  • Page 1 Install a C-Node. Page 6 check indicator status. Connect the remote modem. Page 11 Install a SMS modem. Page 6 Page 14 Install software. Page 7 Install a Remote modem. Copyright © Huawei Technologies Co., Ltd. 2012. All rights reserved.
  • Page 2 List of Tools and Materials SD-Node C-Node Switch Remote modem SMS modem 1E1 trunk cable PGND cable AC power cable KVM cables 100M/1000M network cable PS/2 to USB converter Floating nut, M6 screw, and ESD suite Stack cables M4 screw Phillips screwdriver Diagonal pliers ESD gloves...
  • Page 3: Taking Antistatic Measures

    Taking Antistatic Measures Wearing an ESD Wrist Strap Scenario 1: Wearing an ESD wrist strap with a plug Scenario 2: Wearing an ESD wrist strap with a crocodile clip For an ESD wrist strap with a plug, insert the plug into the ESD jack on the cabinet (scenario 1). For an ESD wrist strap with a crocodile clip, snap the clip onto the cabinet (scenario 2).
  • Page 4 Installing Hardware Devices of the CSE Determining Positions of Devices in the Cabinet The CSE uses a cloud storage system (CSS) as the back-end storage. This section uses the CSS as an example to explain how to install a CSE system. This section uses the configuration of three C-Nodes in the CSE as an example.
  • Page 5: Installing A Switch

    Removing Filler Panels Remove only filler panels that cover the planned installation positions. Installing Back-End Storage Devices Install the back-end storage device by referring to the accompanying documents. Installing a KVM Fix the mounting ears on the square Slide the KVM along the guide rails. Install the KVM balancing pole to the hole bars of the cabinet by using M6 rear of the cabinet.
  • Page 6 Installing an SD-Node To keep the gravity balance of the cabinet, you are advised to install devices of the CSE from bottom to top. Slide the SD-Node into the cabinet along the guide rails. Fix the device in the cabinet using two M6 screws.
  • Page 7: Connecting Cables

    Installing a Remote Modem Because the SD-Node provides only one serial port, you cannot connect an SMS modem and a remote modem at the same time. The remote modem is equipped with a 220 V to 12 V transformer, which connects to an external power supply. The remote modem is a small and light purchased component.
  • Page 8 Connecting Network Cables of the CSE Network cables are delivered with labels that describe the connections. Connect the network cables by referring to the labels. Before connecting the network cables, make sure that the devices have been grounded securely. This figure shows the network cable connections among devices of the CSE. Power cable connections and ground cable connections are not illustrated.
  • Page 9 Distribution of Switch Ports On a switch, network ports are numbered from bottom to top and then from left to right. Network cables are clearly labeled before delivery. The following tables describe distribution of network ports on switches to help you quickly complete network cable connections. Distribution of network ports on switch 1 Device Port Switch port Number...
  • Page 10 Connecting an SD-Node Connect cables in the sequence of the ground cables, network cables, then power cables. This section uses SD-Node-2 as an example to describe cable connections of an SD-Node. Connect cables of SD- Node-1 in the same way. The SMS modem connects only to SD-Node-2.
  • Page 11 Connecting the LAN Switch Rear panels of the two switches in a cabinet are connected to each other through two crossed stack cables. If the CSE has an expansion cabinet, switches in the system cabinet are connected to those in the expansion cabinet through four network cables.
  • Page 12 Powering On the System and Checking Indicator Status Device Power-On Sequence Connect the Power on the Power on the Power on the Power on the Power on the Power on the cabinet to the back-end LAN Switch SD-Node C-Node modem external power storage devices Mandatory...
  • Page 13 Status Indicators of an SD-Node(Rear View) Name Normal State Steady green Power running indicator Steady green: The data transfer rate between the SD-Node and 2、3、4、5 LNK indicator of the service application server (AS) is 100 Mbit/s. network port on the expansion network adapter Steady green Link indicator of the...
  • Page 14: Installing Software

    Configure event notification. Discover the CSE. Mandatory Mandatory Optional parent item child item child item For details, refer to the OceanStor CloudStor CSE Software Installation Guide. HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base Bantian Longgang Shenzhen 518129 People’s Republic of China http://enterprise.huawei.com...

This manual is also suitable for:

V100r001c01

Table of Contents