Huawei OptiX OSN 9800 U32 Enhanced Subrack V100 Quick Installation Manual page 63

Hide thumbs Also See for OptiX OSN 9800 U32 Enhanced Subrack V100:
Table of Contents

Advertisement

c
Installing Power Cables
63 A + 125 A Power Input
Determine the power input positions.
Install the copper fitting (short) (NEG–) and power cable (NEG–).
Power cable
(NEG-)
PSU
PSU PSU PSU PSU PSU EFI PSU PSU PSU PSU PSU
Copper fitting
(short)
63 A
125 A
63
M6
3# screwdriver
5.10±0.51 N· m

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents