Installing the Air Deflector at the Bottom of an A66B Cabinet

NOTE
After the bolts are installed, you need to perform the following steps to install the air deflector.
Use M6 screws to fix the air deflector to the cabinet. Ensure that the air intake vent of the air deflector
faces the bottom of the subrack and the air exhaust vent faces the rear door of the cabinet.
Tighten the screws on the air deflector in holes 1 and 4 of the cabinet.
Air exhaust vent
(green) backward
M6
2# screwdriver
2.04±0.20 N.M
27
Air intake vent
(red) upward