Installing Boards And Components; Installing Boards - Huawei OptiX OSN 9800 U32 Enhanced Subrack V100 Quick Installation Manual

Hide thumbs Also See for OptiX OSN 9800 U32 Enhanced Subrack V100:
Table of Contents

Advertisement

Installing Boards and Components

9.1

Installing Boards

a
Installing PSU and EFI Boards
CAUTION
Wear an ESD wrist strap or ESD
gloves during operations.
PSU/EFI installation area
NOTE
Ensure that the EFI and PSU boards are
properly installed.
Installing an EFI board:
Insert the EFI board into the equipment with
steady force and push the handles to align the
EFI board panel with the subrack, ensuring that
the EFI board is fully seated in the subrack.
Installing a PSU board:
Push the PSU board into the equipment with
steady and push the handles to align the PSU
board panel with the subrack, ensuring that the
PSU board is fully seated in the subrack.
PSU and EFI board slots
Subrack
Board
U32
PSU
Enhanced
Subrack
EFI
CAUTION
The board is designed for easy installation. If you feel a
blockage when inserting a board into a slot, remove the board
and check whether it was inserted correctly or whether it is of
the correct type. Do not use force to insert the board.
M3
2# screwdriver
0.39–0.43 N· m
46
Slot
IU100-IU104
IU106-U110
IU105
Tighten the screws on the front
panel of the EFI board.
Tighten the screws on the front
panel of the PSU board.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents