Number
Name
24
Hammer
25
MPO Cleaning Tool
The required installation tools may vary depending on the site conditions.
In addition to the basic tools, protractor, ladder, safety equipment, and cleaning
tools must also be arranged, considering the site conditions.
5G NR HRU Installation Manual v1.0
Copyright © 2018, All Rights Reserved.
Specification
Normal
FUJIOPTICS
(Part No.: CLE-ELE-1.25/2.5)
Confidential
Chapter 1 Before Installation
Purpose of use
Fixing anchor
Cleaning MPO connector
9