2
Remove the Quake Proof Stabilizer kit component from the existing rack
side to which another rack will be connected.
Remove all screws or bolts from the Quake Proof Stabilizer kit components on the
connection side securing the rack to the building floor, and then remove the Quake Proof
Stabilizer kit components from the rack connection side.
Also, remove the screws or bolts from the front/rear Quake Proof Stabilizer kit components
that are on the side to which another rack will be connected.
'
Quake Proof
Stabilizer kit
component (front)
88
Be careful not to lose the Quake Proof Stabilizer kit components and bolts. They
will be used later.
Bolt that secures
the stabilizer
to the floor
Bolt on the connection side
Bolt on the rack connection side
Quake Proof
Stabilizer kit
component (rear)
Quake Proof
Stabilizer kit
component (side)
Bolt that secures
the stabilizer to the rack