PDU8000 Modular Precision PDC
User Manual (FusionModule2000 V2.0)
Categor
y
Accessor
ies/Cons
umables
5.2.3 Preparing Consumables
Prepare firestop putty for sealing cable holes after cable connection. The firestop putty are not
delivered with the PDC, and needs to be purchased by the customer.
5.2.4 Checking Personnel Requirements
Construction personnel must have basic knowledge of safe operation, be trained to master
correct operation methods, and have the appropriate job qualifications.
Issue 02 (2017-02-24)
Tools and Materials
Rubber mallet
Nylon cable tie
ESD gloves
Safety goggles
This table may not list some tools required at specific sites. Onsite installation personnel and
technical support personnel should prepare the tools based on site requirements.
Some dedicated tools and installation materials delivered with equipment may not be listed in this
table.
To prevent electric shock, get tools insulated and wear ESD gloves when connecting cables.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
N/A
Polyvinyl chloride
(PVC) insulation tape
Protective gloves
ESD wrist strap
5 Installation Guide
N/A
Marker
Safety helmet
Insulated gloves
33