6.1 Verification Before Power-On

Table 6-1 Check items and acceptance criteria
No.
1
2
3
4
5
6
7
8
9
Issue 01 (2020-04-17)
6
Check Item
SUN2000
WLAN antenna
Cables routing
Cable tie
Grounding
Switch
Cable connection
Unused terminal and port
Installation environment
Copyright © Huawei Technologies Co., Ltd.

System Commissioning

Acceptance Criteria
The SUN2000 is installed correctly and
securely.
The WLAN antenna is installed correctly
and securely.
Cables are routed properly as required by the
customer.
Cable ties are evenly distributed and no burr
exists.
The PE cable is connected correctly,
securely, and reliably.
The DC switch and all the switches
connecting to the SUN2000 are OFF.
The AC output power cable, DC input power
cable, battery cable, and signal cable are
connected correctly, securely, and reliably.
Unused terminals and ports are locked by
watertight caps.
The installation space is proper, and the
installation environment is clean and tidy.
6 System Commissioning