SUN2000-(2KTL-5KTL)-L1
User Manual
Issue 01 (2020-04-17)
Figure 5-23 Balanced three-phase grid connection
Figure 5-24 Connecting cables to the power meter (balanced three-phase grid
connection)
In the preceding networking, the SUN2000s are cascaded and support the grid-tied point control
function to achieve zero export.
If the SUN2000s requires the grid-tied point control function, they need to be connected to a power
meter.
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connection
54