24 EN – Main switch and EMC C1 filter options installation supplement
Connect the power cables
See the figures in section
step numbers.
1. Remove the rubber grommets from the cable entry.
2. Motor cable: Prepare the motor cable according to the R1...R5 quick installation
and start-up guide of the drive, except the text below in this step. See figure 2 in
section
R5 Figures
+B056+F316, +B056+E223: Lead the cable through the toroidal core.
Note: Do not strip the cable under the clamp (2a), otherwise the toroidal core
does not remove interference from the motor cable.
EN
Tighten the screws to the torque given below figure 3.
DA
3. +B056+F278, +B056+F316: Remove the fingerguard off from the main switch by
releasing the clip with a screwdriver (3a) and lifting the fingerguard off (3b).
DE
4. Input cable: Connect the input cable phase conductors as follows. Figure 4 on
page
262
shows a main switch but your drive can have a terminal block instead.
ES
Tighten the screws to the torque given below figures 4 and 5.
FI
Ground the shield 360 degrees by tightening the clamp of the power cable
grounding shelf onto the stripped part of the cable (4a).
FR
Connect the twisted shield of the cable to the grounding terminal (4b).
+B056+F278, +B056+F316:
IT
brown phase conductor to terminal 2T1 of the main switch (4c)
NL
black phase conductor to terminal 4T2 of the main switch (4d)
gray phase conductor the terminal 6T3 of the main switch (4e).
PL
+B056+E223:
brown phase conductor to terminal L1 of the terminal block
PT
black phase conductor to terminal L2 of the terminal block
RU
gray phase conductor the terminal L3 of the terminal block.
5. +B056+F278, +B056+F316: Reinstall the finger guard.
SV
Do according to the R1...R5 quick installation and start-up guide of the drive
TR
• Reinstall the shroud on the power terminals.
ZH
• Connect the control cables.
• Install optional modules if any (according to the drive hardware manual).
• Reinstall cover(s).
R5 Figures
on page 262. The figure numbers refer to the
on page
262