16 EN – Main switch and EMC C1 filter options installation supplement
Installation
Do according to the R1...R5 quick installation and start-up guide of
the drive
• Check if capacitors need to be reformed.
• Select the power cables.
• Ensure the cooling.
• Protect the drive and input power cable with suitable fuses.
• R1...R2: Open the cover by removing one screw on each side.
• R3: Open the top cover by removing two screws on each side and then the cable
EN
box cover by removing two screws on each side.
DA
• R4: Open the top cover by removing three screws on each side and then the
cable box cover by removing two screws on each side.
DE
• R5: Open the top cover by removing five screws on each side and the cable box
cover by removing two screws on each side.
ES
Note: If the drive has a main switch (+F278 or +F316), it must be in the OFF
position (see the figure below) to be able to open the cable box cover.
FI
FR
OFF
IT
NL
• Install the drive on the wall.
PL
PT
RU
SV
TR
ZH