Preparatory Items For Initial Settings - Mitsubishi Electric AE-200A Instruction Book

Air conditioning control system, bacnet function
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

7-2. Preparatory items for initial settings

Prepare the following equipment and materials to make initial settings and trial run.
Item
Diagram of air conditioning control
system for building
Required
material
Others
AE-200/AE-50/EW-50 Instruction
Book (BACnet
AE-200/AE-50/EW-50 Instruction
Book (Initial Settings)
AE-200/AE-50/EW-50 Instruction
Book (BACnet
AE-200/AE-50/EW-50 Installation
Manual
Manual
AE-200/AE-50/EW-50 Instruction
Book (Apportioned Electricity Billing
Function)
Instruction Book and Installation
Manual of each air conditioning unit
and controller
PC
*1
BACnet
BACnet
"BACnet connection" license
Device/
"Charge" license
equipment
Switching HUB
LAN cable (Category 5 or above
straight cable)
General tools such as a screwdriver
Tester
*1 Refer to the AE-200/AE-50/EW-50 Instruction Book (Initial Settings) and the AE-200/AE-50/EW-50 Instruction Book (BACnet
Tool) for required specs, etc.
*2 When using the apportioned electricity billing function, materials and machine parts are required to configure the apportioned electricity
billing function. Refer to the AE-200/AE-50/EW-50 Instruction Book (Apportioned Electricity Billing Function) for details.
®
*3 BACnet
Setting Tool installer includes BACnet
WT07919X04
Contents
*2
®
function)
®
Setting Tool)
®
Setting Tool
*3
®
Trial Run Tool
®
Setting Tool and Initial Setting Tool.
Q'ty
1
Group configuration and IP address etc.
®
BACnet
devices list, notification items, documents related
-
to notification destination and notification methods
1
(This manual)
1
1
1
Included with AE-200/AE-50/EW-50
Used only when the apportioned electricity billing function is
1
used.
1
Used for operating Web browser/Initial Setting Tool/BACnet
1
Setting Tool
1
®
Used for BACnet
trial run and log interval setting of the
1
trend log.
1
Consult your dealer for details.
Used only when the apportioned electricity billing function is
1
used. Consult your dealer for details.
2
Used for connecting Initial Setting Tool/BACnet
2
Used for connecting Initial Setting Tool/BACnet
1
1
Used for checking wiring and voltage
37
Remarks
®
Setting Tool
®
Setting Tool
®
®
Setting

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50eEw-50eAe-50aEw-50aAe-200e

Table of Contents