Introduction
1
– continued
Installation Hardware
RF
Power
1
1
1
1
4
4
8
8
4
4
4
4
1
1
2
2
4
4
4
16
4
4
4
4
1
1
2
2
6
6
6
6
6
6
4
4
4
4
1
–
1
–
–
12
–
3
–
3
–
12
–
1
18
Table 1-2 shows the quantity and description of the installation hardware
that is shipped with the RF Cabinet and with the Power Cabinet.
Figure 1-1 is a template guide for identifying the parts.
Table 1-2: Installation Hardware Supplied with Cabinets
7/16" Hex Tool
ESD Wrist Strap
Cabinet Mounting Brackets
M12 x 30 Bolts (for Mounting Brackets)
Insulating Shoulder Washer (for Mounting Bolts)
5/8" Bolts (to replace eye bolts)
Compression Lug (for #2 AWG Ground Wire)
M6 Stainless Steel Locking Hex Nuts (for Ground Lug)
M12 x 100 Bolt
M12 Flat Washer
M12 Lock Washer
M12 Nut
Motorola Ivory Touch–Up Paint
M6 Flat Washer
M10 Nut
M10 Flat Washer
M10 Lock Washer
5/8" Flat Washer
Large Flat Washer
Weatherseal Bushing and Nut for RGPS Cable
MMI Cable
Battery Terminal Straps
#2/0 AWG INS WELD Cable (Red)
#2/0 AWG INS WELD Cable (Black)
90° Compression Lug (for #2/0 AWG DC Cable)
Twisted Pair Cable (for Power Cabinet Alarms to RF Cabinet)
SC
4812ET RF and Power Cabinet Hardware Installation Manual
TM
Description
DRAFT
Apr 2001
V02.03