What's Next and Cleanup
– continued
Fill out Installation Completion
Checklist
6
Status
No.
1
2
3
4
5
6
7
8
9
10
120
– Check that all FRU modules and doors are closed and latched.
– Organize any items (manuals, materials, etc.) left on site and place
them in a location specified by the site manager.
After the site is cleaned up, fill out the installation completion checklist
(see Table 6-1) and make any necessary copies. Make copies of this
checklist as needed.
Date Hardware Installation Completed:
Site:
Master BTS Cabinet Serial Number(s):
Expansion BTS Cabinet Serial Number(s):
Checklist Completed By:
Checklist Reviewed By:
Table 6-1: Installation Completion Checklist
Item
Cabinets are bolted down with mounting bolts
properly torqued.
Each cabinet has its own earth ground that is
connected to a proper site grounding system.
AC power cabling completed and checked by an
electrician and the AC breakers are "OFF".
DC power cabling between Power and RF cabinets
is installed and the DC breakers are "OFF".
Battery breakers are "OFF".
RX RF cables installed.
TX RF cables installed.
RF connections are properly sealed with tape.
Span and Modem line cables installed.
RF cabinet alarm cable is installed.
SC
4812ET RF and Power Cabinet Hardware Installation Manual
TM
DRAFT
Notes
Ground MUST be connected first.
. . . continued on next page