Loading And Installation; Handling Precautions - Mitsubishi Electric AJ65SBT2B-64AD User Manual

Analog-digital converter module
Table of Contents

Advertisement

4. LOADING AND INSTALLATION

4.1 Handling Precautions

This section describes precautions for handling the AJ65SBT2B-64AD.
(1) Tighten screws (such as a module fixing screw) within the
tightening torque range specified in the table below.
Screw
Module mounting screw (M4)
Terminal block terminal screw (M3)
Vis de borne sur plaque à bornes(vis M3)
Terminal block mounting screw (M3.5)
(2) When using a DIN rail, pay attention to the following:
(a) Applicable DIN rail (compliant with IEC 60715)
(b) Installation screw intervals
(3) When mounting the AJ65SBT2B-64AD to a DIN rail, push in the
DIN rail hook until it clicks.
(4) For names, specifications, and manufacturers of applicable cables,
refer to the user's manual for the master module used.
Table 4.1 Tightening torque range
TH35-7.5Fe
TH35-7.5Al
Tighten the screws at intervals of 200mm or less.
DIN rail
DIN rail hook
Figure 4.1 Mounting a module to a DIN rail
Tightening torque range
0.78 to 1.08N•m
0.59 to 0.88N•m
0,59 à 0,88 N•m
0.68 to 0.98N•m
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents