ETP4830-A1 Embedded Power
User Manual
Step 4 Set the battery and load circuit breakers based on the site requirements.
Step 5 Observe the power system for 15 minutes. If no alarm is generated on the SMU LCD, the
voltage and current for batteries and loads are normal. In this case, clean and leave the site.
----End
Issue 10 (2017-08-08)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Commissioning
42