Huawei ETP4830-A1 User Manual page 50

Embedded power
Hide thumbs Also See for ETP4830-A1:
Table of Contents

Advertisement

ETP4830-A1 Embedded Power
User Manual
Step 4 Set the battery and load circuit breakers based on the site requirements.
Step 5 Observe the power system for 15 minutes. If no alarm is generated on the SMU LCD, the
voltage and current for batteries and loads are normal. In this case, clean and leave the site.
----End
Issue 10 (2017-08-08)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Commissioning
42

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents