Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
When operating Huawei equipment, in addition to following the general precautions in this document, follow the specific safety instructions given by Huawei. Only trained and qualified personnel are allowed to install, operate, and maintain Huawei equipment. This product should be used in the environment that meets design specifications.
User Manual 2 Overview Overview 2.1 Introduction The ETP4830-A1 is a box-type power system that supplies power for -48 V DC communications equipment. It uses 15 A rectifiers and provides a maximum output current of 30 A. 2.2 Model Number Description Figure 2-1 shows the ETP4830-A1 model number description.
ETP4830-A1 User Manual 4 Installation Figure 4-2 Installing a subrack The ETP4830-A1 can be installed in a European Telecommunications Standards Institute (ETSI) rack if the required mounting ears are available. ----End 4.2 Installing Components 4.2.1 Installing an SMU Procedure Step 1 Insert a new SMU into the slot, push the locking latch towards the left, and pull out the handle.
Figure 4-7 Connecting a communications cable to the SMU01A COM port Connecting a Communications Cable to the SMU01B Connect the COM port on the SMU01B to the corresponding serial port on the Huawei access network communications equipment using a communications cable when you use the U2000...
ETP4830-A1 User Manual 6 Commissioning Figure 6-3 SNMPv3 parameters Step 7 Set the SNMP trap destination address and trap port. Step 8 Upload the MIB libraries HUAWEI-MIB.mib and HUAWEI-SITE-MONITOR-MIB.mib to the NMS. ----End 6.9 Connecting the Battery Supply Prerequisites To avoid damage to batteries, switch on the battery circuit breaker only after correctly setting the battery parameters.
ETP4830-A1 User Manual 7 Maintenance Maintenance 7.1 Routine Maintenance Maintain the ETP4830-A1 periodically based on site requirements. The recommended maintenance interval is six months. Table 7-1 Routine maintenance checklist Item Maintenance Content Check That Check Repair When Measures Method Electrical...