Transporting The Machine - Toro Workman GTX Operator's Manual

Electric utility vehicle
Hide thumbs Also See for Workman GTX:
Table of Contents

Advertisement

Refer to the following table for load volume limits with
various materials:
Material
Gravel, dry
1522 kg/m
Gravel, wet
1922 kg/m
Sand, dry
1442 kg/m
Sand, wet
1922 kg/m
Wood
721 kg/m
Bark
<721 kg/m
Earth, packed
1602 kg/m

Transporting the Machine

Use a trailer with full-width ramps to move the
machine a long distance. Ensure that you secure the
machine to the trailer. Refer to
22
for the tie-down locations on the machine.
Note:
Load the machine on the trailer with the front
of the machine facing forward. If that is not possible,
secure the machine hood to the frame with a strap,
or remove the hood and transport and secure it
separately or the hood may blow off during transport.
CAUTION
Loose seats may fall off the machine and
trailer when transporting the machine, and
the seats may land on another machine or
obstruct the roadway.
Remove the seats or make sure that the seats
are securely fastened to the coupling in the
seat shroud.
Density
Maximum Cargo
Bed Capacity
(on level ground)
3
(95
Full
lb/ft
3
)
3
(120
3/4 Full
lb/ft
3
)
3
(90
Full
lb/ft
3
)
3
(120
3/4 full
lb/ft
3
)
3
(45 lb/ft
3
)
Full
3
(<45
Full
lb/ft
3
)
3
(100
3/4 Full
lb/ft
3
)
(approximately)
Figure 21
and
1. Towing tongue and tie-down point (front of the machine)
Figure
1. Rear tie-down points
24
Figure 21
Figure 22
g034029
g034273

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

070410704307131tc0713907139tc07153

Table of Contents