3.4.2 Mounting the SmartLogger Along a Guide Rail

Context
No guide rail is delivered with a SmartLogger. If you need to install a SmartLogger on a guide
rail, prepare a standard 35 mm wide guide rail. For details about the guide rail dimensions, see
Figure 3-8.
Figure 3-8 Guide rail dimensions (unit: mm)
Procedure
Step 1 Remove the mounting ears from the SmartLogger using a Phillips screwdriver, as shown in
Figure 3-9.
(2016-06-20)
Verify that the length of the guide rail is sufficient for securing the SmartLogger. The
recommended length is 450 mm or greater. If an RS485 signal SPD needs to be installed
on the guide rail, the recommended guide rail length is 600 mm or greater.
Secure the guide rail before mounting the SmartLogger.