Powering On Rp Components; Labeling Cables; Cable Label - Huawei RP100 Installation Manual

Room presence
Hide thumbs Also See for RP100:
Table of Contents

Advertisement

6 Unpacking the Box and Checking the Items in It
6.4

Powering On RP Components

6.4
Before installing the RP, power on the components listed in the following table and check
whether they work properly For details about the cables and cable connections, see
and
13 Connecting Cables
Component
Item to Check
It starts up properly and a
HD display
boot animation is played.
It starts up properly. The
TE30
indicator first blinks green
and then turns steady green.
It starts up properly. The
TE50
indicator first blinks blue and
then turns steady blue.
VPC600
It starts up properly.
Touch panel
It starts up properly.
(optional)

7 Labeling Cables

RP cables can be distinguished by their BOM numbers and labels.
Before installing the RP, label its cables for subsequent maintenance and connection.
7.1

Cable Label

For each cable, we provide a pair of Chinese labels and a pair of English labels.
[P01] Extension power
cable 02230ECS
[P01] Wall-mounted
power port 02230EC
[P05] Video display extension
power cable (for RP100 only)
[P05] PDU
.
[P01] Extension power
cable 02230ECS
[P01] Wall-mounted
power port 02230EC
[P05] Video display
extension power cable
(for RP100 only)
[P05] PDU
Procedure
Connect the power cable and press
the display power button ON. For
an LG HD display, the infrared
control cable also needs to be
connected.
Connect the power cable and press
the display power button ON.
Connect the power cable and press
the display power button ON.
Connect the power cable and press
the display power button ON.
Press the power button.
10
7.2 Cable List
Troubleshooting
Contact Huawei
engineers for a
replacement.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rp200

Table of Contents