Unpacking; Checking The Packing List - Huawei RP100 Installation Manual

Room presence
Hide thumbs Also See for RP100:
Table of Contents

Advertisement

6 Unpacking the Box and Checking the Items in It
6.2

Unpacking

RP components boxes are made of cardboard. The following procedure uses the rack box as
an example.
1
Cut the packaging straps with a pair of diagonal pliers.
2
Remove the packaging clips.
6.3

Checking the Packing List

Before installing the RP, check its components based on the packing list. If any component is
missing or damaged, contact Huawei engineers for a replacement.
The touch panel and its bracket are optional accessories. They are delivered in two boxes
separately. If you have bought them, check whether they are received and intact.
Packing List
Model
Part
Rack
Single-screen bracket
Dual-screen bracket
TE30 videoconferencing
endpoint
VPC600 HD camera
VPM220 microphone array
HD display
RP100-
RP200-
46S/55S
46S/55S
X
X
X
X
√ (2)
9
Open the box cover.
3
4
Remove the box.
RP100-
RP200-
46A/55A
46A/55A
X
X
X
X
X
√ (2)
Packing
Rack box
(big)
TP device box
(small)
display box

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rp200

Table of Contents