6. Remove the shoulder bolts and nuts securing the oil
cooler to the top of the front screen (Figure 28).
Figure 28
1. Nut
2. Oil cooler
7. Remove the front screen.
8. When finished, install the front screen with the 4
bolts removed previously.
9. Install the oil cooler to the front screen with the 4
shoulder bolts and nuts removed previously.
10. Slide the heat shield between the frame and the
front weight and secure it to the front screen grill
using the carriage bolts and nuts removed previously
(Figure 26).
11. Tighten the bolts securing the front weight
(Figure 26).
12. Install the side screens and close the hood.
3. Front screen
4. Shoulder bolts
Lubrication
Greasing the Traction Unit
Service Interval: Before each use or daily (Grease
immediately after every washing.)
Grease Type: General-purpose grease.
1. Lower the loader arms and stop the engine. Remove
the key.
2. Clean the grease fittings with a rag.
3. Connect a grease gun to each fitting (Figure 29).
4. Pump grease into the fittings until grease begins to
ooze out of the bearings (approximately 3 pumps).
5. Wipe up any excess grease.
25
Figure 29