Installation In A Tall Unit In Combination With An Oven - Miele dgc 6805 Operating And Installation Instructions

Steam combination oven
Table of Contents

Advertisement

Installation in a tall unit in combination with an oven

The furniture housing unit must not have a back panel fitted behind the
building-in niche.
a Steam oven
b Niche
c Inlet for mains connection cable to the appliance
d Recommended position for electrical socket. Important: Do not position behind
the appliance.
e Mains connection cable
f Oven
* Glass front / ** metal front
Building-in dimensions
183

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents