Installing The Communication Card - Lenovo RT8.0kVA Installation And User Manual

6u rack or tower ups
Hide thumbs Also See for RT8.0kVA:
Table of Contents

Advertisement

4. Adjust the orientation of the LCD panel and the logo, as shown.
5. Adjust the angle of vision of the LCD panel., as shown.

Installing the communication card

About this task
Follow these steps to install the UPS Network Management Card if it is not
preinstalled.
Note: It is not necessary to shut down the UPS before installing the card.
24
Installation and User's Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt11.0va

Table of Contents