8.1.3 Main unit status

- Table 8.1.3 lists whether an SB addition can be added in each main unit status.
Main unit status
- AC power to the main unit is off
(Cold maintenance (AC power off))
- AC power to the main unit is on
- System Powered Off
(Cold maintenance (standby))
- AC power to the main unit is on
- System Powered On
(Hot maintenance)
SET0802000

8.2 Procedure for adding a PSU

SET0802010

8.2.1 Checking the delivered items

(1) Check the delivered items by confirming the following.
1. The types and quantities of delivered options match those written on the order sheet.
2. The delivered items match those listed in the List of Accessories.
3. All cabinets are free of any abnormalities such as scratches, dents, or dirt.
4. The target functions can be used with the specifications and version level of units delivered
separately due to delivery considerations.
SET0802020

8.2.2 Mounting the adding options

Use the following steps to mount the added options.
ANNT) If you start the work with the main unit powered off, turn on the AC power and mount the added
options.
(1) Connect the FST. See Appendix B.2.1, "FST Setup and Connection (APP0202010)".
(2) Login to the Web-UI.
Table 8.2.2-1 lists the values to be set to log in to Web-UI.
See Appendix B.3.1, "Login (APP0203010)".
Table 8.1.3
Work possible?
Yes
Yes
Yes