Led Operation - Honeywell VideoBloX User Manual

Matrix switcher chassis only
Hide thumbs Also See for VideoBloX:
Table of Contents

Advertisement

LED OPERATION

Rev 1.0
After completing installation;
1.
Both LEDs on the HVBMATPIT should be lit solid.
2.
The TX, RX and RTS data LEDs on the VideoBloX power supply module should be
flashing.
3.
The Video Input Card LEDs should be flashing.
4.
Upon receipt of a valid command from the MAXPRO-Net PC, both yellow and green
Led on the PIT should flicker.
VideoBloX Chassis Only User Manual
55
900.0855
10/06

Advertisement

Table of Contents
loading

Table of Contents