Preparing A New Iop For Installation; Installing A New Iop - HP NetServer AA 4000 Administrator's Manual

Hp netserver aa 6200 solution release 3.0 administrator’s guide
Hide thumbs Also See for NetServer AA 4000:
Table of Contents

Advertisement

Chapter 9

Preparing a New IOP for Installation

After removing the IOP from the server configuration, prepare the replacement IOP for
installation:
Step
Action
1
Install any hardware for your IOP using the
procedures in
NetServer AA Solution Installation Guide.
2
Decide which, if any, disks will be
transferred to the new IOP.
3
If you are installing and replacing existing
mirrored disks with new disks:
• Make sure that the new disk's
configuration is identical to its mirror
counterpart on the other IOP.
• Make sure that the new disk's
configuration is identical to the disk that
you are replacing (including the same
SCSI bus number and device ID).

Installing a New IOP

Caution: Before proceeding, make sure you are properly grounded using, for instance, a
wrist strap with an attached alligator clip that is connected to an appropriate
ground
After preparing the new IOP, finish installing the new IOP:
224
Chapter 2
of the
HP
.
Notes
Warning: If you removed the Ethernet adapter that
provides network access from the IOP
that you are replacing, do not use it in
any other network device other than the
new IOP.
When you install those disks, make sure that their
new configuration is identical to the configuration
that was used in the IOP that you are replacing.
You can replace a disk that is larger than its
counterpart in the other IOP. However, you will not
be able to use all of its capacity.
Maintenance

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netserver aa 6200

Table of Contents