Appendix; Start-Up Report - Honeywell SMARTLINE RM77 Supplementary Instructions Manual

10 ghz radar (fmcw) level meter for distance, level, volume, flow, mass and reflection measurement of liquids
Table of Contents

Advertisement

SMARTLINE® RM77

10.1 Start-up report

WARNING!
Complete the start-up checklist before you energize the device.
Please complete this start-up checklist and return it to the manufacturer.
Are the polarity and the supply voltage correct?
Ex-approved devices only: does the device and the installation agrees with the
requirements of the Ex certificate of compliance?
Are all the wetted components (antenna, flange and gaskets) resistant to the product in the
tank?
Does the information on the signal converter nameplate agree with the operating data?
Are the process temperature and pressure in the limits for operation of the device?
Did you correctly install the device on the tank?
Do the electrical connections agree with the national electrical codes?
I hereby confirm that I have completed the start-up checklist.
Date:
Stamp:
34-VF-25-105 iss.1 GLO April 15 US
www.honeywell.com/ps

APPENDIX

10
Yes
Yes
Yes
Yes
No
No
No
No
Signature: