2.5.2 Install 1 RU Distribution Shelf Load Connections

Figure 2-23
Step 4
Connect cables to equipment that requires the supplied DC Power per that equipment's specifications.
Step 5
Install fuses by sliding them into the appropriate slot
Figure 2-24
An empty space should be left on each side of any 15A GMT fuse used for thermal considerations.
Note
2.5.2 Install 1 RU Distribution Shelf Load Connections
The following section is for systems that use the 1 RU Distribution Shelf. For systems without the 1 RU
Distribution Shelf, go to
Cisco AC/DC Power System User Guide, R1.0
2-26
Installing GMT Cabling
Installing Fuses
15A Fuse
Chapter 4, "System Operation."
(Figure
2-24).
Blank
Blank
Chapter 2
System Installation
May 2006

Advertisement

Table of Contents
loading

This manual is also suitable for:

124778159330

Table of Contents