2.5 Install Load-and-Return Connections

Figure 2-21
Reinsert the terminal block
Step 7
Alarm cables run from the rear of the system shelf (leaving enough of a service loop to allow the drawer
Step 8
to slide out) through the access window (between the controller drawer and the GMT drawer area)
(Figure
Secure the alarm cables using the provided strain relief tie-offs to aid in cable management.
Step 9
2.5 Install Load-and-Return Connections
The following section contains information on installing different distribution options available for the
power system.
the 1 RU Distribution Shelf.
Table 2-7
Wire Gauge Stranded
10 to 8 AWG
(6mm² to 10mm²)
22 AWG (0.34mm²)
18 AWG (0.75mm²)
Cisco AC/DC Power System User Guide, R1.0
2-24
Alarm Board Connection Points
(Figure 2-20
2-20).
Table 2-7
provides a list of recommended wire gauges for both the GMT fuse panel and
Recommended Wire Sizes
Applications
Breaker Load
(up to 30A)
2A GMT Fuses
5A GMT Fuses
#3).