Chapter 2
System Installation
Table 2-7
Wire Gauge Stranded
14 AWG (2.5mm²)
14 AWG (2.5mm²)
2.5.1 Install GMT Fuse Connections
Load connections to the GMT fuse panel are made using spring loaded terminals that do not require the
use of connection lugs.
Locate the GMT fuse connections by removing the controller faceplate
Step 1
GMT drawer out
Figure 2-22
Route the GMT load-and-return cabling from the rear of the system shelf (leaving enough of a service
Step 2
loop to allow the drawer to slide out) through the fuse panel channel and secure using the supplied
tie-downs.
Connect the wires to the appropriate terminal by using a flat screwdriver to open the terminal
Step 3
(Figure
to fuses: Side A (1-5) and Side B (1-5) from left to right (viewed from the front of the system).
May 2006
Recommended Wire Sizes (continued)
Applications
10A GMT Fuses
15A GMT Fuses
(Figure
2-22).
GMT Drawer
2-23) and inserting the appropriate cable into the spring-loaded terminals. Terminals correspond
2.5.1 Install GMT Fuse Connections
(Figure
2-19) and sliding the
Cisco AC/DC Power System User Guide, R1.0
2-25