Cisco AS5400 Installation Manual page 24

Universal gateway card
Hide thumbs Also See for AS5400:
Table of Contents

Advertisement

Removing and Installing Populated Carrier Cards
Tighten the two captive screws to secure the carrier card to the chassis. (See
Step 3
Figure 2-9
Captive screw
Figure 2-10 Tighten the Captive Screws on the Cisco AS5400
Captive
screw
If the carrier card has a blank DFC slot, install a blank cover over the open DFC slot to ensure proper
Step 4
airflow inside the chassis. (See
Figure 2-11 Blank DFC Cover
For AC powered units, reconnect the AC power cord. For DC powered units, remove the tape from the
Step 5
circuit breaker switch handle, and reinstate power by moving the handle of the circuit breaker to the ON
position. For more information on the AC and DC power supplies, refer to the chassis installation guide
that came with your universal gateway.
Reconnect all interface cables.
Step 6
Cisco AS5350 and Cisco AS5400 Universal Gateway Card Installation Guide
2-6
Tighten the Captive Screws on the Cisco AS5350
Figure
2-11.)
Chapter 2
Dial Feature Card and Carrier Card Guidelines
Figure 2-9
Captive screw
Captive
screw
and
Figure
2-10.)
78-13311-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

As5350

Table of Contents