Operation - Makita TD110D Instruction Manual

Hide thumbs Also See for TD110D:
Table of Contents

Advertisement

Available languages

Available languages

For tool with shallow driver bit hole
A=12mm
B=9mm
For tool with deep driver bit hole
A=17mm
B=14mm
A=12mm
B=9mm
1.
To install the driver bit, pull the sleeve in the direc-
tion of the arrow and insert the driver bit into the
sleeve as far as it will go.
Then release the sleeve to secure the driver bit.
Fig.7: 1. Driver bit
2.
To install the driver bit, pull the sleeve in the direc-
tion of the arrow and insert the bit-piece and driver
bit into the sleeve as far as it will go. The bit-piece
should be inserted into the sleeve with its pointed
end facing in. Then release the sleeve to secure
the driver bit.
Fig.8: 1. Driver bit
To remove the driver bit, pull the sleeve in the direction
of the arrow and pull the driver bit out.
NOTE: If the driver bit is not inserted deep enough
into the sleeve, the sleeve will not return to its original
position and the driver bit will not be secured. In this
case, try re-inserting the bit according to the instruc-
tions above.
NOTE: After inserting the driver bit, make sure that it
Fig.9: 1. Groove
2. Hook
The hook is convenient for temporarily hanging the tool.
This can be installed on either side of the tool. To install
the hook, insert it into a groove in the tool housing on
either side and then secure it with a screw. To remove,
loosen the screw and then take it out.

OPERATION

Fig.10
The proper fastening torque may differ depending upon
the kind or size of the screw/bolt, the material of the
workpiece to be fastened, etc. The relation between fas-
Use only these type of driver
bit. Follow the procedure
1. (Note) Bit-piece is not
necessary.
To install these types of driver
bits, follow the procedure 1.
To install these types of driver
bits, follow the procedure 2.
(Note) Bit-piece is necessary
for installing the bit.
2. Sleeve
2. Bit-piece
3. Sleeve
3. Screw
N•m
(kgf•cm)
100
(1020)
80
(816)
60
(612)
2
40
(408)
20
(204)
0
1. Fastening time (second)
N•m
(kgf•cm)
100
(1020)
80
(816)
60
(612)
2
40
(408)
20
(204)
0
1. Fastening time (second)
in the screw head. Apply forward pressure to the tool to
the extent that the bit will not slip off the screw and turn
the tool on to start operation.
M12
M10
M12
M8
M10
M8
1
2
1
2. Fastening torque
M10
M10
M8
M8
1
2
1
2. Fastening torque
ENGLISH
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Td110dz

Table of Contents