Setting Language And Time; Checking Product Information - AEG AS-BSL1-4000 Series Installation Manual

Low voltage energy storage unit battery pack
Table of Contents

Advertisement

to the grid, select „Use of energy for house load only"
Nothing else has to be adjusted then..
The section „Feed-in times" allows you to adjust the
intervals at which you wish to discharge the battery by
feeding the energy to the grid.
If the generated energy should be used for house load
and grid feed-in, please select „Use of energy for house
load & grid feed-in". The time intervalls for this have
then to be adjusted.

Setting language and time

The sub-menu „Language Settings" allows you to
choose the system languages from a set of given
languages (default: English).
AEG LOW VOLTAGE ENERGY STORAGE UNIT (4 kWH) INSTALLATION MANUAL
The sub-menu „Time and date" allows you to set a
different time and date than the default one. Please
make sure to set the local time and date immediately
after installation, as other parameters (such as charging
time, discharging time etc) depend on them..

Checking product information

In the section „Product information" you can find
specific system information such as system PNC
(Product Name Code) and version, inverter and battery
pack version.
23
The „Advanced
settings" and „Reset
settings" sub-menus
within the „Settings"
menu shall be operated
by installers.
EN
PD202107 V1-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

As-bbl1-4000

Table of Contents