the corresponding load terminals, fasten them, and
tighten the screws. The crimping torque is 1.5–2.5
N•m.
Here below is a scheme of the storage system's
electrical connection within the whole PV installation
,
Item.
Description
1
System
2
Distribution box
3
Back-up loads
4
On-grid
5
PV
6
Generator
7
RCD
8
Back-up loads
9
Limit
10
Grid
11
E-bar
12
E-bar
13
Generator
14
RCD
15
Normal loads
16
PV
Notes:
•
CT direction: towards grid
AEG LOW VOLTAGE ENERGY STORAGE UNIT (4 kWH) INSTALLATION MANUAL
CT connection
Item. Description
1
CT connector
2
CT connectorx Connect to white CT wire
3
CT
4.7 Warnings
The AEG energy storage system does not support
parallel (three- and single-phase) operation on the
AC-backup. Parallel operation of the AEG storage
system will void the warranty.
3-phase load
Remark
Connect to black CT wire
+22°
EN
PD202107 V1-21
18