Wire Specifications; Installation Location; Choosing The Installation Site; Unboxing And Package Content - AEG AS-BSL1-4000 Series Installation Manual

Low voltage energy storage unit battery pack
Table of Contents

Advertisement

4.3 Wire specifications

Energy storage system:
In order to standardize the specifications of AC and DC
connectors or terminals of the compatible inverters,
please make sure to follow the below requirements for
connecting the AC and DC wires of the corresponding
inverter types:
Grid & Load side
Recommended:
Ø 4 mm² wire
Battery pack:
Please make sure to follow the below requirements for
the connecting wires of AS-BBL1-4000:
Battery wire
Communication
cable
Recommended:
Recommended:
Ø 16 mm² wire
standard
with double
communication
insulation
cable with
shielding
function

4.4 Installation location

In order to ensure good ventilation of the energy
storage system, please ensure there is enough clear
space around the system during installation as per the
following recommendations.
Position
Min.space
Side space
100 cm
Back space
10 cm

4.4.1 Choosing the installation site

The cabinet hosting the energy storage system is
IP20 and suitable for installation in dry, dust-free
environments. According to EMC standards, the system
is designed to meet the installation requirements in a
home environment.
AEG LOW VOLTAGE ENERGY STORAGE UNIT (4 kWH) INSTALLATION MANUAL
PV Side
Recommended:
Ø 4 mm² wire
Remote
wire
Recommended:
Ø 0.5 mm² of
Teflon wire
Remarks
Keep a 100 cm
clearance on either
side of the AEG
system
This side needs to
be installed against
the wall
Select the installation site according to the following
requirements:
The installation site should be well ventilated and
sheltered from direct sunlight, rain and snow;
The building is designed to withstand earthquakes
The location should not be in proximity of the sea,
to avoid salt water and humidity.
Ensure there are no corrosive gases at the
installation site, including ammonia and acid vapor.
Ensure there are no flammable or explosive
materials at the installation site or nearby.
The floor of the installation site must be dry and
flat. Under no circumstance there should be water
on the ground in proximity of the energy storage
system. Ensure that the ground level is levelled and
can fully carry the weight of the energy storage
system.
The installation site should be clean.
Ensure enough clear space between the front,
rear, left and right, top and wall of the energy
storage system to ensure good ventilation and heat
dissipation, and to provide space for installation,
maintenance, and safe escape.
The ambient temperature of the installation site
should range between -10 °C and 40 °C; the relative
temperature should range between 4% to 100 %.
Note: If the ambient temperature is outside of
the operating range, the battery pack will go in
self-protection mode and stop operating. The
optimal temperature range for the battery pack to
operate is between 15°C and 30°C degrees. Frequent
exposure to harsh temperatures may deteriorate the
performance and lifetime of the battery pack. For this
reason, it is recommended that temperature and
humidity stay at a constant level.

4.5 Unboxing and package content

Before installing the product, please carry out a first
check of the package and the package content as
described in 2.2 „Handling safety".
Energy storage system package content
The package content of your AEG energy storage
system includes:
14
EN
PD202107 V1-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

As-bbl1-4000

Table of Contents