1-phase load
A single PV string cannot be connected to two or
more AEG energy storage systems.
PV
The UPS (Uninterruptible Power Supply) cannot
be connected to the grid.
Back-up
The AEG energy storage system must be
grounded. Failure to do so might cause damage to the
product and severe personal injuries.
It is not recommended to connect air conditioners
and water pumps with the AEG energy storage
system AS-BSL1-4000.
AEG LOW VOLTAGE ENERGY STORAGE UNIT (4 kWH) INSTALLATION MANUAL
PV
On-grid

5. OPERATION

5.1 Operating the AEG battery pack

There are two ways to operate the AEG battery pack
AS-BBL1-4000:
Method 1: Short PIN2 and PIN3 of Remote port first,
then press the metal button switch. The battery pack
will start to work within 25 seconds. If there is no
communication input, after 5 minutes it will stop to
function.
Method 2: Install a switch between PIN1 and PIN2 on
the Remote port. When the switch is turned on, the
battery pack will start to work within 25 seconds. If
there is no communication input, after 5 minutes it will
stop to function.
Item.
Description
1
Remote portl
2
PIN1 of Remote port
3
PIN2 of Remote port
4
PIN3 of Remote port
19
EN
PD202107 V1-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

As-bbl1-4000

Table of Contents