The complete system is preadjusted on delivery to reduce time spent on the installation. Use
the following procedure for correct installation :
1. Each column is delivered with a drilling and positioning gauge which indicates the central
position of a swivel (M6 screw plug provided with the column) and the position of 4 fixing
holes located at each corner of the base plate (fixing screws are not provided with the
column).
• Draw a line on the ground to visualize the infrared beam path between the 2 columns.
Place the center of each gauge on each end of this line, and orientate the gauge
representing the column base plates according to this line.
Drill the ø 8 mm hole indicated on the center of each gauge and install the swivel for
each column. Drill the 4 fixing holes at each corner of the base plate. Place each
column on its swivel and roughly adjust their orientation according to the line.
2. Each column is delivered with 4 sets of adjusting wedges and HCM10-30 screws which must
be used to adjust the verticalness of the columns.
• Install wedges and screws on each corner of the column base plate, and use a
(magnetic) spirit level to adjust the verticalness of the columns. Each column must
be perpendicular to the ground, parallel to each other and in the same plane. To
achieve verticalness, use 3 screws for the adjustment and the 4th one for securing
the adjustment.
107063-11 EN FR26 GLO 800 Printed in France
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Spirit level
Adjustment screws
Wedges
Use 3 screws for the verticalness adjustment
th
Use the 4
screw for securing the adjustment
Position and drilling gauge
Columns must be in the same plane
Bad
Columns must be parallel to
each other and perpendicular
to the ground
Adjusting screws
Swivel
Fixing holes
Good
39