Honeywell FF-SPS4 Series Installation Manual page 38

Safety perimeter guarding
Table of Contents

Advertisement

Figure 2-16 Floor-mounted Deflection Mirrors (for reference only)
100 X 120 (3.94 x 4.73)
107063-11 EN FR26 GLO 800 Printed in France
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Arrow.com.
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
34 (1.34)
Note
Mirrors
European norm (EN 999) specifies beam heights as
follows:
SCZ02MIR (2 beams)
SCZ03MIR (3 beams)
SCZ04MIR (4 beams)
List of parts
R 98
120 (4.73)
200 (7.88)
4 R6.5 at 90°
Number of beams
A
400
(15.7)
300
(11.8)
300
(11.8)
Description
Adjusting wedges
HCM10-30 screws for vertical adjustment
Swivel (M6 screw plug)
Drilling gauge FF-SCZ0 ... MIR
Drilling gauge FF-SCZ0 ... ... ... ... MIR
4 fixing holes
Heights in mm (in.)
B
C
900
-
(35.4)
700
1100
(35.4)
(35.4)
600
900
1200
(35.4)
(35.4)
(47.2)
Quantity
4
4
1
1
267 (10.52)
Ø8 hole for M6 screw plug
D
-
-
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents