Panasonic DVC PRO Studio AJ-D950P Service Manual page 59

Vtr/analog video interface kit
Table of Contents

Advertisement

so that its groove is matched with the pin of Drive Arm Unit.
3. Tighten 4 screws (C), (D) and (E) then confirm the Reel Table
moves smoothly on the Rail by hand.
4. Move the Reel Rotor Unit to front side by hand and pull up the iron
core of M stopper solenoid
5. Unload completely by rotating the Red Plastic screw CCW.
6. Insert the flexible cable into P34 and P35 on the Mech. I/F board.
7. Confirm the Main Brake Torque. (Refer to the Main Brake Torque
Confirmation.)
8. Adjust the Motor Torque Offset. (Refer to the Motor Torque Offset
Adjustment.)
9. Confirm the Tension Value. (Refer to the Tension Confirmation.)
Mech. IF Board
Removal Reel Rotor Unit
59

Advertisement

Table of Contents
loading

Table of Contents