Chapter 5 - Building ControlNet Trunk Cables
2. Insert the cable into the cable strip tool's cutting chamber so that extra cable, approximately 25.4
mm (1 in), extends beyond the edge of the tool. The cutting chamber houses the center conductor
that will be exposed when the cable is stripped.
3. Lock the cable into place by moving the chamber-gauge ring forward until it meets the cable, with
slight resistance. The gauge moves two rollers toward the cable and regulates the depth of the cut.
The gauge will "click" as it moves from one stage to the next.
- 32 -